Sakarya Phase 2 Deepwater Field Development
2022 – till date | Subsea 7
Project Details
Name: Sakarya Phase 2 Deepwater Field Development
Client: Subsea 7 Sutton, United Kingdom
Date: 2022 – till date
Project Description
Sakarya Gas Field is a large gas reserve across numerous blocks located approximately 170 km offshore Black Sea at a maximum water depth of 2200 m. Turkish Petroleum Corporation (TPAO) is planning to develop Sakarya Gas Field ensuring the first gas arrival to onshore within 2023 from the C26 field, followed by a ramp up of production from other fields.
The additional onshore and offshore infrastructure necessary to achieve increase in production capacity by 30Msm3d / 1050 mmscfd.
Services Rendered
- Provide Project Management
- Provide Technical Consultancy (Riser Team Lead for (Engineering, Construction, Installation)
- Participate in Project Expert Committee meetings, Prelim Hazard Assessments, Detailed Design